SOLAR Β· ERCOT

Shoe Bar Solar

Shoe Bar Solar is a 206 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0178
Grid region
ERCOT (Texas)
Developer
Oberon Solar V, LLC
Connection point (POI)
138 kV Raceway Switch (Bus#18663)
Technology
Solar: 206 MW
Total requested
206 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
29 October 2024
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem