United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

Perseus Gas

Perseus Gas is a 1,057 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0320
Grid region
ERCOT (Texas)
Developer
Engie Flexible Generation NA LLC
Connection point (POI)
Tap 345kV 84550 BLULACY 7A β€šΓ„Γ¬ 8455 Lon Hill 7A Ckt 2
Technology
Gas: 1,057 MW
Total requested
1,057 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 August 2024
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem