United States βΊ Grid βΊ Interconnection queues
GAS Β· ERCOTPerseus Gas
Perseus Gas is a 1,057 MW gas request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 27INR0320
- Grid region
- ERCOT (Texas)
- Developer
- Engie Flexible Generation NA LLC
- Connection point (POI)
- Tap 345kV 84550 BLULACY 7A βΓΓ¬ 8455 Lon Hill 7A Ckt 2
- Technology
- Gas: 1,057 MW
- Total requested
- 1,057 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 16 August 2024
- Proposed online date
- December 2028
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem