United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

HyFuels Iron Horse Solar

HyFuels Iron Horse Solar is a 201 MW solar request withdrawn in the ERCOT interconnection queue, in Victoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0439
Grid region
ERCOT (Texas)
Developer
HyFuels Green Lake Solar LLC
Connection point (POI)
8189 Tungsten 138kV
Location
Victoria County, Texas
Technology
Solar: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 March 2024
Proposed online date
October 2026
Withdrawn
July 2024

Location

Marker shows the centre of Victoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Victoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem