United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Sentinel Solar

Sentinel Solar is a 271 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0339
Grid region
ERCOT (Texas)
Developer
Alamo Ranch Solar Project, LLC
Connection point (POI)
tap 345kV 80219 Lobo - 5709 Fowlerton CKT2
Technology
Solar: 271 MW
Total requested
271 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 October 2024
Proposed online date
January 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem