Rippling Curve Peaking Power

Rippling Curve Peaking Power is a 208 MW gas request withdrawn in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
29INR0048
Grid region
ERCOT (Texas)
Developer
OxyVinyls LP
Connection point (POI)
41580 TIDAL__X06B8 138kV
Location
Harris County, Texas
Technology
Gas: 208 MW
Total requested
208 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
3 September 2024
Proposed online date
January 2029
Withdrawn
December 2025

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem