BATTERY STORAGE Β· ERCOT

Kobernat Storage

Kobernat Storage is a 51.5 MW battery storage request withdrawn in the ERCOT interconnection queue, in Starr County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2024 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0323
Grid region
ERCOT (Texas)
Developer
BT Kobernat Solar, LLC
Connection point (POI)
A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE AEP TEXAS CENTRAL OWNED GARZA (BUS #8399) - LISTON - (BUS #8394) 138 KV LINE
Location
Starr County, Texas
Technology
Battery: 51.5 MW
Total requested
51.5 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 February 2024
Proposed online date
December 2026
Withdrawn
April 2025

Location

Marker shows the centre of Starr County; the queue data does not give exact sites.