United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTTierra Alta Storage SLF
Tierra Alta Storage SLF is a 205 MW battery storage request withdrawn in the ERCOT interconnection queue, in Schleicher County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2024 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 28INR0239
- Grid region
- ERCOT (Texas)
- Developer
- ET Fuels US Inc.
- Connection point (POI)
- Tap 138 kV 6490 Santiago – 6015 Maddux
- Location
- Schleicher County, Texas
- Technology
- Battery: 205 MW
- Total requested
- 205 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 18 December 2024
- Proposed online date
- October 2028
- Withdrawn
- April 2025
Location
Marker shows the centre of Schleicher County; the queue data does not give exact sites.
Other requests in Schleicher County
- Cold Creek Solar 2Solar + storage · 445 MW · agreement signed
- Rockefeller StorageBattery storage · 207 MW · agreement signed
- Cold Creek Storage 2Solar + storage · 174 MW · agreement signed
- Sombrero SolarSolar · 352 MW · in study
- Live Oak Wind IIOnshore wind · 303 MW · in study
- Easy Wind Energy CenterWind + storage · 241 MW · in study
- Easy Battery Energy Storage CenterWind + storage · 200 MW · in study
- Cashel BESSBattery storage · 150 MW · in study
- Proving Ground SolarSolar + storage · 82.1 MW · in study
- Tipperary SolarSolar · 60.2 MW · in study
- Proving Ground BESSSolar + storage · 51.4 MW · in study
- Rockefeller SolarSolar · 208 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem