BATTERY STORAGE Β· ERCOT

Fletcher BESS

Fletcher BESS is a 310 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0304
Grid region
ERCOT (Texas)
Developer
Archer Energy Center, LLC
Connection point (POI)
Tap 138 kV 44630 Garth β€šΓ„Γ¬ 48156 Highlands
Technology
Battery: 310 MW
Total requested
310 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 July 2024
Proposed online date
July 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem