OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in ISO-NE (New England) — page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown982118.1 GW
Active in queue14.6 GW72 requests
Agreement signed8,609 MW45 requests
Withdrawn982118.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

982 requests · page 8 of 20
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
81.0 MWWithdrawn / abandoned Bristol, MAISO-NE Jun 2024target 2027
Battery Storage
Battery storage
80.9 MWWithdrawn / abandoned Middlesex, CTISO-NE May 2022target 2026
Wind
Onshore wind
80.0 MWWithdrawn / abandoned Merrimack, NHISO-NE Sep 2011target 2014
Wind
Onshore wind
79.9 MWWithdrawn / abandoned Oxford, MEISO-NE Dec 2011target 2014
Wind Farm
Onshore wind
79.2 MWWithdrawn / abandoned Somerset, MEISO-NE Aug 2015target 2019
Solar
Solar
78.4 MWWithdrawn / abandoned Franklin, MEISO-NE Jun 2016target 2018
Solar
Solar
78.4 MWWithdrawn / abandoned Cheshire, NHISO-NE Jun 2016target 2018
Gas Turbine
Other
78.0 MWWithdrawn / abandoned New Haven, CTISO-NE Dec 2006target 2011
Gas Turbine
Gas
77.0 MWWithdrawn / abandoned Worcester, MAISO-NE Jan 2008target 2011
Solar
Solar
76.3 MWWithdrawn / abandoned Merrimack, NHISO-NE Aug 2020target 2025
Battery Storage
Battery storage
76.0 MWWithdrawn / abandoned Plymouth, MAISO-NE Dec 2023target 2027
Battery Storage
Battery storage
76.0 MWWithdrawn / abandoned Plymouth, MAISO-NE May 2024target 2027
Solar
Solar
75.3 MWWithdrawn / abandoned Washington, MEISO-NE Jul 2022target 2026
Solar
Solar
75.0 MWWithdrawn / abandoned Franklin, MEISO-NE Mar 2022target 2025
Battery Storage
Battery storage
75.0 MWWithdrawn / abandoned New London, CTISO-NE Jan 2023target 2028
Solar
Solar
75.0 MWWithdrawn / abandoned Washington, MEISO-NE Oct 2016target 2022
Steam Turbines
Other
75.0 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2016target 2018
Offshore Wind with battery addition
Other
75.0 MWWithdrawn / abandoned MAISO-NE Dec 2017target 2023
Wind
Onshore wind
74.3 MWWithdrawn / abandoned Merrimack, NHISO-NE Sep 2013target 2016
Wind
Onshore wind
73.5 MWWithdrawn / abandoned Windham, VTISO-NE Dec 2014target 2019
Solar
Solar
72.0 MWWithdrawn / abandoned Somerset, MEISO-NE Apr 2021target 2024
Powder Mill substation - NG Western MA Area Cluster Study
Solar
70.7 MWWithdrawn / abandoned Worcester, MAISO-NE Mar 2019target 2020
Battery Storage
Battery storage
69.4 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2023target 2026
Gas Turbine Capacity Increase( #178)
Gas
69.0 MWWithdrawn / abandoned Plymouth, MAISO-NE Dec 2006target 2010
Combined Cycle GT
Gas
68.0 MWWithdrawn / abandoned Bristol, MAISO-NE Apr 2016target 2020
Solar
Solar
68.0 MWWithdrawn / abandoned Penobscot, MEISO-NE Feb 2024target 2028
Biomass Project
Other
67.5 MWWithdrawn / abandoned Coos, NHISO-NE Feb 2007target 2009
Wind
Onshore wind
65.6 MWWithdrawn / abandoned Oxford, MEISO-NE Apr 2017target 2020
Solar
Solar
65.0 MWWithdrawn / abandoned Cheshire, NHISO-NE Apr 2016target 2018
Gas Turbine
Gas
65.0 MWWithdrawn / abandoned New Haven, CTISO-NE Nov 2007target 2010
Solar
Solar
65.0 MWWithdrawn / abandoned Oxford, MEISO-NE Oct 2020target 2024
Solar
Solar
63.0 MWWithdrawn / abandoned Windham, CTISO-NE Jun 2016target 2018
Beacon Falls Energy Park
Gas
62.9 MWWithdrawn / abandoned New Haven, CTISO-NE Feb 2015target 2022
Battery Storage
Battery storage
62.8 MWWithdrawn / abandoned Kent, RIISO-NE Mar 2022target 2025
Biomass Project ( Also see queue position #223)
Other
62.0 MWWithdrawn / abandoned Berkshire, MAISO-NE Jun 2007target 2010
Wind
Onshore wind
60.0 MWWithdrawn / abandoned Caledonia, VTISO-NE Jan 2012target 2015
Ansonia Generation
Gas
60.0 MWWithdrawn / abandoned New Haven, CTISO-NE Jan 2007target 2013
Solar
Solar
60.0 MWWithdrawn / abandoned Grafton, NHISO-NE Jul 2019target 2022
Solar
Solar
60.0 MWWithdrawn / abandoned Coos, NHISO-NE Jun 2020target 2023
Solar
Solar
60.0 MWWithdrawn / abandoned Coos, NHISO-NE Jun 2020target 2023
Wind Project
Onshore wind
60.0 MWWithdrawn / abandoned Rutland, VTISO-NE Sep 2006target 2010
Battery Storage
Battery storage
60.0 MWWithdrawn / abandoned Hartford, CTISO-NE Apr 2022target 2024
Detroit/Guilford/Belfast DG Area Study
Solar + storage
57.7 MWWithdrawn / abandoned Piscataquis, MEISO-NE May 2022target 2027
Solar (QF)
Solar
56.5 MWWithdrawn / abandoned Washington, RIISO-NE Oct 2018target 2021
Eversource Group Study @ Wareham
Solar + storage
55.1 MWWithdrawn / abandoned Plymouth, MAISO-NE Mar 2020target 2023
Roxbury Solar
Solar
55.0 MWWithdrawn / abandoned Oxford, MEISO-NE Oct 2019target 2024
Battery Storage
Battery storage
55.0 MWWithdrawn / abandoned Franklin, MAISO-NE Mar 2021target 2025
Gas Turbine Capacity Increase (see #155)
Gas
55.0 MWWithdrawn / abandoned Middlesex, MAISO-NE Aug 2006target 2011
Battery Storage
Battery storage
55.0 MWWithdrawn / abandoned Providence, RIISO-NE Oct 2022target 2027
Russell Biomass
Other
55.0 MWWithdrawn / abandoned Hampden, MAISO-NE Aug 2005target 2015
Page 8 of 20

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)