Biomass Project

Biomass Project is a 67.5 MW other request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2007 (completed)
  2. Withdrawn / abandonedMay 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
198
Grid region
ISO-NE (New England)
Connection point (POI)
Near PSNH Lost Nation substation
Location
Coos County, New Hampshire
Technology
Other: 67.5 MW
Total requested
67.5 MW
Service type
Other
Queue status
Withdrawn
Entered queue
8 February 2007
Proposed online date
June 2009
Withdrawn
May 2008

Location

Marker shows the centre of Coos County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Coos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem