United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
SOLAR Β· ISO-NESolar
Solar is a 60.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1035
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Berlin to Lost Nation 115 kV Line W179; 44.564565, -71.19104; 9.69 miles from Berlin substation, 18.27 miles from Lost Nation substation
- Location
- Coos County, New Hampshire
- Technology
- Solar: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 29 June 2020
- Proposed online date
- December 2023
- Withdrawn
- September 2020
Location
Marker shows the centre of Coos County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Coos County
- Granite Reliable PowerOnshore wind Β· 94.5 MW Β· built
- Burgess BioPowerOther Β· 58.7 MW Β· built
- GLHA James River/Fraser Paper7Hydro Β· 25.0 MW Β· built
- Berlin Energy Uprate and Battery AdditionOther Β· 15.0 MW Β· built
- Burgess BioPower IncreaseOther Β· 9.0 MW Β· built
- Jericho WindOnshore wind Β· 8.6 MW Β· built
- Jericho Wind expansionOnshore wind Β· 3.5 MW Β· built
- WindOnshore wind Β· 180 MW Β· withdrawn
- WindOnshore wind Β· 146 MW Β· withdrawn
- Solar + Battery StorageSolar + storage Β· 113 MW Β· withdrawn
- Biomass ProjectOther Β· 67.5 MW Β· withdrawn
- SolarSolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem