United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 75.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedNov 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1244
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV New Sturtevant Substation (PSSE Bus Number: 100116)
- Location
- Franklin County, Maine
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2022
- Proposed online date
- November 2025
- Withdrawn
- November 2022
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Farminton SolarSolar Β· 78.4 MW Β· built
- Kibby Wind ProjectOnshore wind Β· 65.0 MW Β· built
- Saddleback Ridge Wind ProjectOnshore wind Β· 33.0 MW Β· built
- Verso Androscoggin Energy Cogen 1, 2, & 3 IncreaseGas Β· 26.0 MW Β· built
- Battery storage addition (see Q663)Wind + storage Β· 266 MW Β· withdrawn
- WindOnshore wind Β· 246 MW Β· withdrawn
- WindOnshore wind Β· 245 MW Β· withdrawn
- WindOnshore wind Β· 241 MW Β· withdrawn
- WindOnshore wind Β· 241 MW Β· withdrawn
- battery storage additional (see Q664)Wind + storage Β· 239 MW Β· withdrawn
- WindOnshore wind Β· 216 MW Β· withdrawn
- WindOnshore wind Β· 216 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem