United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

SOLAR Β· ISO-NE

Solar

Solar is a 75.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1244
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV New Sturtevant Substation (PSSE Bus Number: 100116)
Location
Franklin County, Maine
Technology
Solar: 75.0 MW
Total requested
75.0 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
31 March 2022
Proposed online date
November 2025
Withdrawn
November 2022

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.