United States › Grid › Interconnection queues › Maine
WIND + STORAGE · ISO-NEBattery storage addition (see Q663)
Battery storage addition (see Q663) is a 266 MW wind + storage request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2017 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 665
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CMP Larrabee Road Station,345 kV
- Location
- Franklin County, Maine
- Technology
- Wind: 266 MW · Battery
- Total requested
- 266 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 21 July 2017
- Proposed online date
- October 2020
- Withdrawn
- April 2018
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Farminton SolarSolar · 78.4 MW · built
- Kibby Wind ProjectOnshore wind · 65.0 MW · built
- Saddleback Ridge Wind ProjectOnshore wind · 33.0 MW · built
- Verso Androscoggin Energy Cogen 1, 2, & 3 IncreaseGas · 26.0 MW · built
- WindOnshore wind · 246 MW · withdrawn
- WindOnshore wind · 245 MW · withdrawn
- WindOnshore wind · 241 MW · withdrawn
- WindOnshore wind · 241 MW · withdrawn
- battery storage additional (see Q664)Wind + storage · 239 MW · withdrawn
- WindOnshore wind · 216 MW · withdrawn
- WindOnshore wind · 216 MW · withdrawn
- WindOnshore wind · 214 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem