United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 246 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2016 (completed)
  2. Withdrawn / abandonedApr 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
594
Grid region
ISO-NE (New England)
Connection point (POI)
CMP''s existing Orrington - Albion Road 345 kV line section 3023
Location
Franklin County, Maine
Technology
Wind: 246 MW
Total requested
246 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
27 January 2016
Proposed online date
October 2019
Withdrawn
April 2018

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem