πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Gas Turbine

Gas Turbine is a 77.0 MW gas request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2008 (completed)
  2. Withdrawn / abandonedDec 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
246
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV bus at Millbury substation
Location
Worcester County, Massachusetts
Technology
Gas: 77.0 MW
Total requested
77.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
29 January 2008
Proposed online date
June 2011
Withdrawn
December 2008

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem