United States › Grid › Interconnection queues › Massachusetts

SOLAR · ISO-NE

Litchfield substation - NG Western MA Area Cluster Study

Litchfield substation - NG Western MA Area Cluster Study is a 9.5 MW solar request built and operating in the ISO-NE interconnection queue, in Worcester County, Massachusetts, connecting to NGRID.

Queue statusOperating
  1. PlanningQueued Mar 2019 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Apr 2021 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
854
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
NG Litchfield substation
Location
Worcester County, Massachusetts
Technology
Solar: 9.5 MW
Total requested
9.5 MW
Study phase
IA Executed
Queue status
Operational
Entered queue
21 March 2019
Proposed online date
April 2021

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem