United States › Grid › Interconnection queues › Massachusetts
GAS · ISO-NECombined Cycle Uprate #2
Combined Cycle Uprate #2 is a 30.0 MW gas request built and operating in the ISO-NE interconnection queue, in Worcester County, Massachusetts.
Request details
- Queue ID
- 527
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Milford Power Switch DS-F3 115kV (Nat Grid #D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid #C-129-3).
- Location
- Worcester County, Massachusetts
- Technology
- Gas: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 26 February 2015
- Agreement signed
- 30 April 2018
- Proposed online date
- December 2018
Location
Marker shows the centre of Worcester County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Worcester County
- Battery StorageBattery storage · 204 MW · agreement signed
- Battery StorageBattery storage · 300 MW · in study
- Battery StorageBattery storage · 180 MW · in study
- Crystal Lake Substation - NG Western MA Area Cluster StudySolar · 24.7 MW · built
- Solar with BatterySolar + storage · 10.0 MW · built
- Harrington Street PV Project (QF)Solar · 9.8 MW · built
- Litchfield substation - NG Western MA Area Cluster StudySolar · 9.5 MW · built
- N. Oxford Substation - NG Western MA Area Cluster StudySolar · 8.7 MW · built
- SolarSolar · 8.0 MW · built
- Fitchburg Renewable EnergyOther · 7.2 MW · built
- SolarSolar · 6.0 MW · built
- Westminster - NG Western MA Area Cluster StudySolar · 4.9 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem