ONSHORE WIND Β· ISO-NE

Wind

Wind is a 65.6 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Oxford County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
641
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 115 kV Line 210
Location
Oxford County, Maine
Technology
Wind: 65.6 MW
Total requested
65.6 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
24 April 2017
Proposed online date
December 2020
Withdrawn
August 2018

Location

Marker shows the centre of Oxford County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Oxford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem