Steam Turbines

Steam Turbines is a 75.0 MW other request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2016 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
610
Grid region
ISO-NE (New England)
Connection point (POI)
Central Maine Power (CMP) Riley 115kV Section 230 (K230-2)
Location
Franklin County, Maine
Technology
Oil: 75.0 MW Β· Other
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
22 April 2016
Proposed online date
May 2018
Withdrawn
March 2017

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Franklin County