United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind Farm

Wind Farm is a 79.2 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Somerset County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2015 (completed)
  2. Withdrawn / abandonedApr 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
556
Grid region
ISO-NE (New England)
Connection point (POI)
CMP Wyman - Harris 115 kV
Location
Somerset County, Maine
Technology
Wind: 79.2 MW
Total requested
79.2 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
7 August 2015
Proposed online date
December 2019
Withdrawn
April 2017

Location

Marker shows the centre of Somerset County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Somerset County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem