United States βΊ Grid βΊ Interconnection queues βΊ Maine
ONSHORE WIND Β· ISO-NEWind
Wind is a 117 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Somerset County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2008 (completed)
- Withdrawn / abandonedMar 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 244
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CMP 115 kV Wyman substation
- Location
- Somerset County, Maine
- Technology
- Wind: 117 MW
- Total requested
- 117 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 3 January 2008
- Proposed online date
- December 2013
- Withdrawn
- March 2012
Location
Marker shows the centre of Somerset County; the queue data does not give exact sites.
Other requests in Somerset County
- SolarSolar Β· 165 MW Β· agreement signed
- SolarFairfieldSolar Β· 18.1 MW Β· agreement signed
- Bingham WindOnshore wind Β· 185 MW Β· built
- Three Corners SolarSolar Β· 110 MW Β· built
- Western Maine Wind ProjectOnshore wind Β· 58.8 MW Β· built
- Weston Station AVR Replacement U2-4Hydro Β· 14.8 MW Β· built
- Wyman Hydro Uprate U1Hydro Β· 2.5 MW Β· built
- SolarSolar Β· 165 MW Β· withdrawn
- SolarSolar Β· 152 MW Β· withdrawn
- SolarSolar Β· 150 MW Β· withdrawn
- SolarSolar Β· 103 MW Β· withdrawn
- WindOnshore wind Β· 93.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem