United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 55.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Franklin County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedApr 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1106
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource 115 kv Ashfield substation
- Location
- Franklin County, Massachusetts
- Technology
- Battery: 55.0 MW
- Total requested
- 55.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 15 March 2021
- Proposed online date
- May 2025
- Withdrawn
- April 2021
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Franklin County
- Battery additionOther · 6.7 MW · agreement signed
- Northfield Mt. Equipment ReplacementBattery storage · 1,180 MW · built
- Northfield Mt Upgrade #1Battery storage · 25.0 MW · built
- Wendell Depot Substation - NG Western MA Area Cluster StudySolar · 15.0 MW · built
- Battery StorageBattery storage · 366 MW · withdrawn
- Battery StorageBattery storage · 160 MW · withdrawn
- Battery StorageBattery storage · 105 MW · withdrawn
- Battery StorageBattery storage · 105 MW · withdrawn
- Battery StorageBattery storage · 101 MW · withdrawn
- Battery Storage + SolarSolar + storage · 101 MW · withdrawn
- Battery StorageBattery storage · 100 MW · withdrawn
- Biomass ProjectOther · 49.7 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem