BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 100 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Franklin County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1170
Grid region
ISO-NE (New England)
Connection point (POI)
National Grid's PTF (115kV Y-177 line), located at 42.730250 degrees north latitude, -72.931858 degrees west longitude.
Location
Franklin County, Massachusetts
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
22 October 2021
Proposed online date
January 2023
Withdrawn
October 2023

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Franklin County