United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
OTHER Β· ISO-NEBiomass Project
Biomass Project is a 49.7 MW other request withdrawn in the ISO-NE interconnection queue, in Franklin County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2008 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 282
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV line near Montage or Fench King substations
- Location
- Franklin County, Massachusetts
- Technology
- Other: 49.7 MW
- Total requested
- 49.7 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 15 October 2008
- Proposed online date
- February 2014
- Withdrawn
- June 2011
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Franklin County
- Battery additionOther Β· 6.7 MW Β· agreement signed
- Northfield Mt. Equipment ReplacementBattery storage Β· 1,180 MW Β· built
- Northfield Mt Upgrade #1Battery storage Β· 25.0 MW Β· built
- Wendell Depot Substation - NG Western MA Area Cluster StudySolar Β· 15.0 MW Β· built
- Battery StorageBattery storage Β· 366 MW Β· withdrawn
- Battery StorageBattery storage Β· 160 MW Β· withdrawn
- Battery StorageBattery storage Β· 105 MW Β· withdrawn
- Battery StorageBattery storage Β· 105 MW Β· withdrawn
- Battery StorageBattery storage Β· 101 MW Β· withdrawn
- Battery Storage + SolarSolar + storage Β· 101 MW Β· withdrawn
- Battery StorageBattery storage Β· 100 MW Β· withdrawn
- Battery StorageBattery storage Β· 55.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem