United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

GAS Β· ISO-NE

Gas Turbine

Gas Turbine is a 65.0 MW gas request withdrawn in the ISO-NE interconnection queue, in New Haven County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2007 (completed)
  2. Withdrawn / abandonedFeb 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
235
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P 46 kV circuit from Baldwin Substation
Location
New Haven County, Connecticut
Technology
Gas: 65.0 MW
Total requested
65.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
15 November 2007
Proposed online date
January 2010
Withdrawn
February 2008

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in New Haven County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem