United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Combined Cycle GT

Combined Cycle GT is a 68.0 MW gas request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2016 (completed)
  2. Withdrawn / abandonedMay 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
608
Grid region
ISO-NE (New England)
Connection point (POI)
Located at current Cleary node 375,376 interconnected with National Grid s-8 and v-5 line, SEMA load zone.
Location
Bristol County, Massachusetts
Technology
Gas: 68.0 MW Β· Oil
Total requested
68.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
22 April 2016
Proposed online date
May 2020
Withdrawn
May 2016

Location

Marker shows the centre of Bristol County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Bristol County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem