COAL · ISO-NEBrayton Point 3 Uprate( see 243)
Brayton Point 3 Uprate( see 243) is a 30.0 MW coal request built and operating in the ISO-NE interconnection queue, in Bristol County, Massachusetts.
Request details
- Queue ID
- 231
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Brayton Point 345 kV Switchyard
- Location
- Bristol County, Massachusetts
- Technology
- Coal: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 25 October 2007
- Proposed online date
- December 2011
Location
Marker shows the centre of Bristol County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Bristol County
- Battery StorageBattery storage · 350 MW · in study
- Battery StorageBattery storage · 168 MW · in study
- Dartmouth Power ExpansionGas · 24.0 MW · built
- Increase to Steam Turbine Capacity Uprate (See QPCoal · 6.0 MW · built
- Dighton Power UprateGas · 5.0 MW · built
- SolarSolar · 1.9 MW · built
- Combined CycleGas · 550 MW · withdrawn
- Battery StorageBattery storage · 529 MW · withdrawn
- Battery StorageBattery storage · 293 MW · withdrawn
- Battery StorageBattery storage · 271 MW · withdrawn
- Battery StorageBattery storage · 257 MW · withdrawn
- Energy StorageBattery storage · 246 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem