BATTERY STORAGE · ISO-NEEnergy Storage
Energy Storage is a 246 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedDec 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 876
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource 115kV Cross Road Substation Line 109
- Location
- Bristol County, Massachusetts
- Technology
- Battery: 246 MW
- Total requested
- 246 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Withdrawn
- Entered queue
- 11 April 2019
- Proposed online date
- December 2024
- Withdrawn
- December 2021
Location
Marker shows the centre of Bristol County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Bristol County
- Battery StorageBattery storage · 350 MW · in study
- Battery StorageBattery storage · 168 MW · in study
- Brayton Point 3 Uprate( see 243)Coal · 30.0 MW · built
- Dartmouth Power ExpansionGas · 24.0 MW · built
- Increase to Steam Turbine Capacity Uprate (See QPCoal · 6.0 MW · built
- Dighton Power UprateGas · 5.0 MW · built
- SolarSolar · 1.9 MW · built
- Combined CycleGas · 550 MW · withdrawn
- Battery StorageBattery storage · 529 MW · withdrawn
- Battery StorageBattery storage · 293 MW · withdrawn
- Battery StorageBattery storage · 271 MW · withdrawn
- Battery StorageBattery storage · 257 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem