United States › Grid › Interconnection queues › Maine
SOLAR + STORAGE · ISO-NEDetroit/Guilford/Belfast DG Area Study
Detroit/Guilford/Belfast DG Area Study is a 57.7 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Piscataquis County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2022 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1255
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP Detroit 115 kV Substation
- Location
- Piscataquis County, Maine
- Technology
- Solar: 57.7 MW · Battery
- Total requested
- 57.7 MW
- Queue status
- Withdrawn
- Entered queue
- 2 May 2022
- Proposed online date
- December 2027
- Withdrawn
- June 2025
Location
Marker shows the centre of Piscataquis County; the queue data does not give exact sites.