United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
ONSHORE WIND Β· ISO-NEWind
Wind is a 74.3 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2013 (completed)
- Withdrawn / abandonedMar 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 423
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- A201 Comerford - North Litchfield 230 kV line
- Location
- Merrimack County, New Hampshire
- Technology
- Wind: 74.3 MW
- Total requested
- 74.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2013
- Proposed online date
- December 2016
- Withdrawn
- March 2014
Location
Marker shows the centre of Merrimack County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Merrimack County
- Merrimack Unit 2 Second UprateCoal Β· 17.2 MW Β· built
- Merrimack Unit 2 UprateCoal Β· 4.7 MW Β· built
- Battery StorageBattery storage Β· 226 MW Β· withdrawn
- WindOnshore wind Β· 80.0 MW Β· withdrawn
- SolarSolar Β· 76.3 MW Β· withdrawn
- Solar plus BatterySolar + storage Β· 53.1 MW Β· withdrawn
- SolarSolar Β· 35.0 MW Β· withdrawn
- Battery StorageBattery storage Β· 20.0 MW Β· withdrawn
- Steam TurbineOther Β· 20.0 MW Β· withdrawn
- Pembroke SolarSolar Β· 17.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem