United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 74.3 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2013 (completed)
  2. Withdrawn / abandonedMar 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
423
Grid region
ISO-NE (New England)
Connection point (POI)
A201 Comerford - North Litchfield 230 kV line
Location
Merrimack County, New Hampshire
Technology
Wind: 74.3 MW
Total requested
74.3 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
10 September 2013
Proposed online date
December 2016
Withdrawn
March 2014

Location

Marker shows the centre of Merrimack County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Merrimack County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem