SOLAR + STORAGE · ISO-NE

Solar plus Battery

Solar plus Battery is a 53.1 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1172
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource 115kV F139 line
Location
Merrimack County, New Hampshire
Technology
Solar: 53.1 MW · Battery
Total requested
53.1 MW
Service type
Network resource (NRIS)
Study phase
Not Started
Queue status
Withdrawn
Entered queue
27 October 2021
Proposed online date
July 2025
Withdrawn
October 2024

Location

Marker shows the centre of Merrimack County; the queue data does not give exact sites.

Power plants in New Hampshire · Transmission lines in New Hampshire

Other requests in Merrimack County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem