Pembroke Solar

Pembroke Solar is a 17.5 MW solar request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. ConsentedAug 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
934
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource Pole 334/201 of the 334G Line looped between Garvins & Rimmon, roughly 3.5 miles from Garvins
Location
Merrimack County, New Hampshire
Technology
Solar: 17.5 MW
Total requested
17.5 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
25 October 2019
Agreement signed
15 August 2022
Proposed online date
September 2024
Withdrawn
January 2025

Location

Marker shows the centre of Merrimack County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Merrimack County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem