United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
SOLAR Β· ISO-NEPembroke Solar
Pembroke Solar is a 17.5 MW solar request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2019 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- ConsentedAug 2022 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 934
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Pole 334/201 of the 334G Line looped between Garvins & Rimmon, roughly 3.5 miles from Garvins
- Location
- Merrimack County, New Hampshire
- Technology
- Solar: 17.5 MW
- Total requested
- 17.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Withdrawn
- Entered queue
- 25 October 2019
- Agreement signed
- 15 August 2022
- Proposed online date
- September 2024
- Withdrawn
- January 2025
Location
Marker shows the centre of Merrimack County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Merrimack County
- Merrimack Unit 2 Second UprateCoal Β· 17.2 MW Β· built
- Merrimack Unit 2 UprateCoal Β· 4.7 MW Β· built
- Battery StorageBattery storage Β· 226 MW Β· withdrawn
- WindOnshore wind Β· 80.0 MW Β· withdrawn
- SolarSolar Β· 76.3 MW Β· withdrawn
- WindOnshore wind Β· 74.3 MW Β· withdrawn
- Solar plus BatterySolar + storage Β· 53.1 MW Β· withdrawn
- SolarSolar Β· 35.0 MW Β· withdrawn
- Battery StorageBattery storage Β· 20.0 MW Β· withdrawn
- Steam TurbineOther Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem