United States › Grid › Interconnection queues › New Hampshire
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1574
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- EVERSOURCE 115KV SECTION C196, APPROXIMATELY 1.5 MILES SOUTH OF THE MERRIMACK SUBSTATION.
- Location
- Merrimack County, New Hampshire
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 26 June 2024
- Proposed online date
- June 2028
- Withdrawn
- August 2024
Location
Marker shows the centre of Merrimack County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Merrimack County
- Merrimack Unit 2 Second UprateCoal · 17.2 MW · built
- Merrimack Unit 2 UprateCoal · 4.7 MW · built
- Battery StorageBattery storage · 226 MW · withdrawn
- WindOnshore wind · 80.0 MW · withdrawn
- SolarSolar · 76.3 MW · withdrawn
- WindOnshore wind · 74.3 MW · withdrawn
- Solar plus BatterySolar + storage · 53.1 MW · withdrawn
- SolarSolar · 35.0 MW · withdrawn
- Steam TurbineOther · 20.0 MW · withdrawn
- Pembroke SolarSolar · 17.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem