United States › Grid › Interconnection queues › New Hampshire

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Merrimack County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandonedAug 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1574
Grid region
ISO-NE (New England)
Connection point (POI)
EVERSOURCE 115KV SECTION C196, APPROXIMATELY 1.5 MILES SOUTH OF THE MERRIMACK SUBSTATION.
Location
Merrimack County, New Hampshire
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
26 June 2024
Proposed online date
June 2028
Withdrawn
August 2024

Location

Marker shows the centre of Merrimack County; the queue data does not give exact sites.

Power plants in New Hampshire · Transmission lines in New Hampshire

Other requests in Merrimack County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem