Solar is a 75.3 MW solar request withdrawn in the ISO-NE interconnection queue, in Washington County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2022 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1294
Grid region
ISO-NE (New England)
Connection point (POI)
Ring Bus constructed for QP760 on Versant 115kV Line 52
Location
Washington County, Maine
Technology
Solar: 75.3 MW
Total requested
75.3 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
27 July 2022
Proposed online date
August 2026
Withdrawn
June 2023

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Washington County