United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 92.3 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Washington County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2010 (completed)
  2. Withdrawn / abandonedNov 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
350
Grid region
ISO-NE (New England)
Connection point (POI)
BHE Washington County 115 kV substation
Location
Washington County, Maine
Technology
Wind: 92.3 MW
Total requested
92.3 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
10 November 2010
Proposed online date
December 2015
Withdrawn
November 2013

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem