United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 9.6 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Washington County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2014 (completed)
  2. Withdrawn / abandonedAug 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
478
Grid region
ISO-NE (New England)
Connection point (POI)
Emera 34.5kV Line 16
Location
Washington County, Maine
Technology
Wind: 9.6 MW
Total requested
9.6 MW
Queue status
Withdrawn
Entered queue
1 October 2014
Proposed online date
June 2016
Withdrawn
August 2016

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem