United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 104 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Washington County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2014 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
435
Grid region
ISO-NE (New England)
Connection point (POI)
Bangor Hydro Epping Substation, Columbia, Washington County, ME
Location
Washington County, Maine
Technology
Wind: 104 MW
Total requested
104 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 January 2014
Proposed online date
December 2018
Withdrawn
January 2018

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem