ONSHORE WIND Β· ISO-NE

Downeast Wind

Downeast Wind is a 90.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Washington County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2012 (completed)
  2. Withdrawn / abandonedApr 2018 (project stopped here)
  3. ConsentedSep 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
400
Grid region
ISO-NE (New England)
Connection point (POI)
BHE Epping Substation
Location
Washington County, Maine
Technology
Wind: 90.0 MW
Total requested
90.0 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
3 October 2012
Agreement signed
2 September 2016
Proposed online date
October 2019
Withdrawn
April 2018

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.