GAS · ISO-NEGas Turbine Capacity Increase( #178)
Gas Turbine Capacity Increase( #178) is a 69.0 MW gas request withdrawn in the ISO-NE interconnection queue, in Plymouth County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2006 (completed)
- Withdrawn / abandonedFeb 2007 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 188
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV F19 and/or E20 lines
- Location
- Plymouth County, Massachusetts
- Technology
- Gas: 69.0 MW · Oil
- Total requested
- 69.0 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 7 December 2006
- Proposed online date
- June 2010
- Withdrawn
- February 2007
Location
Marker shows the centre of Plymouth County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Plymouth County
- SolarSolar · 6.8 MW · agreement signed
- Cranberry Point Energy StorageBattery storage · 150 MW · built
- SolarSolar · 9.5 MW · built
- SolarSolar · 4.9 MW · built
- Cranberry Highway Solar + Battery StorageSolar + storage · 2.2 MW · built
- Combined CycleGas · 898 MW · withdrawn
- Combined CycleGas · 870 MW · withdrawn
- Combined CycleGas · 410 MW · withdrawn
- Brockton Combined CycleGas · 332 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem