United States › Grid › Interconnection queues › Massachusetts
SOLAR · ISO-NESolar
Solar is a 6.8 MW solar request with a signed interconnection agreement in the ISO-NE interconnection queue, in Plymouth County, Massachusetts, connecting to NSTAR.
Queue statusConsented
- PlanningQueued Jan 2018 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Apr 2019 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 703
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NSTAR
- Connection point (POI)
- NSTAR Crystal Spring Substation 13.2 kV bus
- Location
- Plymouth County, Massachusetts
- Technology
- Solar: 6.8 MW
- Total requested
- 6.8 MW
- Study phase
- IA Executed
- Queue status
- Active
- Entered queue
- 24 January 2018
- Proposed online date
- April 2019
Location
Marker shows the centre of Plymouth County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Plymouth County
- Cranberry Point Energy StorageBattery storage · 150 MW · built
- SolarSolar · 9.5 MW · built
- SolarSolar · 4.9 MW · built
- Cranberry Highway Solar + Battery StorageSolar + storage · 2.2 MW · built
- Combined CycleGas · 898 MW · withdrawn
- Combined CycleGas · 870 MW · withdrawn
- Combined CycleGas · 410 MW · withdrawn
- Brockton Combined CycleGas · 332 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem