United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
GAS Β· ISO-NECombined Cycle
Combined Cycle is a 410 MW gas request withdrawn in the ISO-NE interconnection queue, in Plymouth County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandonedDec 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 314
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NSTAR 127 and 128 Lines or new 115 kV
- Location
- Plymouth County, Massachusetts
- Technology
- Gas: 410 MW
- Total requested
- 410 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 16 October 2009
- Proposed online date
- May 2015
- Withdrawn
- December 2009
Location
Marker shows the centre of Plymouth County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Plymouth County
- SolarSolar Β· 6.8 MW Β· agreement signed
- Cranberry Point Energy StorageBattery storage Β· 150 MW Β· built
- SolarSolar Β· 9.5 MW Β· built
- SolarSolar Β· 4.9 MW Β· built
- Cranberry Highway Solar + Battery StorageSolar + storage Β· 2.2 MW Β· built
- Combined CycleGas Β· 898 MW Β· withdrawn
- Combined CycleGas Β· 870 MW Β· withdrawn
- Brockton Combined CycleGas Β· 332 MW Β· withdrawn
- Battery StorageBattery storage Β· 189 MW Β· withdrawn
- Battery StorageBattery storage Β· 189 MW Β· withdrawn
- Battery StorageBattery storage Β· 150 MW Β· withdrawn
- Battery StorageBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem