United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NECranberry Point Energy Storage
Cranberry Point Energy Storage is a 150 MW battery storage request built and operating in the ISO-NE interconnection queue, in Plymouth County, Massachusetts.
Request details
- Queue ID
- 726
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Carver 115 kV Primary POI – Loop-in station with 3-breaker ring bus interconnecting to line 127 located just south of Carver substation Alternate POI – Expand the existing station to add a 4th bay
- Location
- Plymouth County, Massachusetts
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 21 March 2018
- Agreement signed
- 8 October 2021
- Proposed online date
- May 2025
Location
Marker shows the centre of Plymouth County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Plymouth County
- SolarSolar · 6.8 MW · agreement signed
- SolarSolar · 9.5 MW · built
- SolarSolar · 4.9 MW · built
- Cranberry Highway Solar + Battery StorageSolar + storage · 2.2 MW · built
- Combined CycleGas · 898 MW · withdrawn
- Combined CycleGas · 870 MW · withdrawn
- Combined CycleGas · 410 MW · withdrawn
- Brockton Combined CycleGas · 332 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem