United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 189 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Plymouth County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1107
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource (NSTAR - South) 115 kV Wareham Line 108
- Location
- Plymouth County, Massachusetts
- Technology
- Battery: 189 MW
- Total requested
- 189 MW
- Service type
- Network resource (NRIS)
- Study phase
- Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 March 2021
- Proposed online date
- May 2027
- Withdrawn
- January 2025
Location
Marker shows the centre of Plymouth County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Plymouth County
- SolarSolar · 6.8 MW · agreement signed
- Cranberry Point Energy StorageBattery storage · 150 MW · built
- SolarSolar · 9.5 MW · built
- SolarSolar · 4.9 MW · built
- Cranberry Highway Solar + Battery StorageSolar + storage · 2.2 MW · built
- Combined CycleGas · 898 MW · withdrawn
- Combined CycleGas · 870 MW · withdrawn
- Combined CycleGas · 410 MW · withdrawn
- Brockton Combined CycleGas · 332 MW · withdrawn
- Battery StorageBattery storage · 189 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
- Battery StorageBattery storage · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem