🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 76.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Plymouth County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2023 (completed)
  2. Withdrawn / abandonedJan 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1468
Grid region
ISO-NE (New England)
Connection point (POI)
The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°58'7.22"N, 71° 1'18.59"W) by tapping the 115-kV Line U6-4 (Bridgewater-Raynham) at approx. 7,87 Km from Br
Location
Plymouth County, Massachusetts
Technology
Battery: 76.0 MW
Total requested
76.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
12 December 2023
Proposed online date
January 2027
Withdrawn
January 2024

Location

Marker shows the centre of Plymouth County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Plymouth County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem