OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 19
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Longfellow Ranch Partners Project Ph 1 Onshore wind · Riata Management, LLC |
80.0 MW | Withdrawn / abandoned |
| Hill Solar Solar · Sunchase Power |
80.0 MW | Withdrawn / abandoned |
| Inverter Field Storage Other · CG WHARTON COUNTY LLC |
80.0 MW | Withdrawn / abandoned |
| Ft. Stockton Solar Solar · HelioSage |
80.0 MW | Withdrawn / abandoned |
| Cameron Wind Onshore wind · Cielo Wind Power |
80.0 MW | Withdrawn / abandoned |
| Grian Solar Solar · Lightsource Renewable Energy Development, LLC |
80.0 MW | Withdrawn / abandoned |
| Lindsay Solar Solar · HelioSage |
80.0 MW | Withdrawn / abandoned |
| Cannon Solar SLF Solar · Cannon Solar, LLC |
80.0 MW | Withdrawn / abandoned |
| Merrifield Solar Solar · Belltown Power |
80.0 MW | Withdrawn / abandoned |
| Magic Valley Chillers Gas · Calpine |
79.0 MW | Withdrawn / abandoned |
| Palmas Altas Wind Onshore wind · Cielo Wind Services |
78.0 MW | Withdrawn / abandoned |
| Nereida Solar Solar · ABEI & INFRASTRUCTURE S.L. |
77.6 MW | Withdrawn / abandoned |
| Augustus Solar Solar · Industrial Golf Project LLC |
76.7 MW | Withdrawn / abandoned |
| Barrett Storage Other · BT Barrett Solar, LLC |
76.5 MW | Withdrawn / abandoned |
| BRP Galan BESS Battery storage · BRP Galan BESS LLC |
76.0 MW | Withdrawn / abandoned |
| SBranch Expansion Solar Solar · CG Wharton County LLC |
76.0 MW | Withdrawn / abandoned |
| Homestead BESS Other · Homestead Power LLC |
75.8 MW | Withdrawn / abandoned |
| Claxton Storage Battery storage · BT Claxton Solar, LLC |
75.7 MW | Withdrawn / abandoned |
| Burkburnett Solar Solar · Sunchase Power |
75.0 MW | Withdrawn / abandoned |
| Callahan Wind Farm Onshore wind · RES North America |
75.0 MW | Withdrawn / abandoned |
| Saltgrass-Sargent Wind Onshore wind · Duke Energy Generation Services |
75.0 MW | Withdrawn / abandoned |
| TX_Marfa_Solar Solar · Lincoln Renewable Energy, LLC |
75.0 MW | Withdrawn / abandoned |
| Millhouse Solar Solar · Cypress Creek Renewables |
75.0 MW | Withdrawn / abandoned |
| McGee Storage 2 Other · BT McGee Storage, LLC |
74.9 MW | Withdrawn / abandoned |
| Kirkwall Solar Solar · ABEI ENERGY |
73.1 MW | Withdrawn / abandoned |
| Gold Coin Storage Battery storage · Grenergy USA |
73.0 MW | Withdrawn / abandoned |
| PV New Glory Solar · PREMIER ENGINEERING USA CORP. |
72.5 MW | Withdrawn / abandoned |
| Blue Star Solar Solar · GH America Energy, LLC |
72.3 MW | Withdrawn / abandoned |
| Country Haven Energy Storage Battery storage · 174 Power Global Properties, LLC |
72.1 MW | Withdrawn / abandoned |
| Windwood Project Onshore wind · Lincoln Renewable Energy, LLC |
72.0 MW | Withdrawn / abandoned |
| Stillwater Storage Other · Cypress Creek Renewables |
72.0 MW | Withdrawn / abandoned |
| High Chap Storage Battery storage · HIGH CHAPARRAL SOLAR PROJECT LLC |
71.8 MW | Withdrawn / abandoned |
| Limestone Wind Farm Onshore wind · Pioneer Green Energy, LLC |
71.0 MW | Withdrawn / abandoned |
| Big Wind Onshore wind · Your Resources, LLC |
70.0 MW | Withdrawn / abandoned |
| Delaware Mt Solar Solar · Nextera |
70.0 MW | Withdrawn / abandoned |
| Blue Summit Windfarm ph 2 Onshore wind · FPL Energy, LLC |
70.0 MW | Withdrawn / abandoned |
| Hathor Solar Solar · ABEI ENERGY & INFRASTRUCTURE |
67.6 MW | Withdrawn / abandoned |
| Temple Generation I Repower Gas |
67.0 MW | Withdrawn / abandoned |
| Pioneer Hutt Solar (Add Additional MWs) Solar · Pioneer Hutt Solar, LLC |
65.8 MW | Withdrawn / abandoned |
| Blue Sky Solar Solar · Blue Sky Solar |
65.0 MW | Withdrawn / abandoned |
| Cargil Solar Solar · Cypress Creek Renewables |
65.0 MW | Withdrawn / abandoned |
| BRP Avila II BESS Other · BRP Avila BESS LLC |
63.7 MW | Withdrawn / abandoned |
| Sun Cactus Storage Other · Sun Cactus Solar Project, LLC |
63.2 MW | Withdrawn / abandoned |
| Nezuko BESS Battery storage · AEU BATTERY PROJECT I LLC |
63.1 MW | Withdrawn / abandoned |
| Mason Mt Wind Onshore wind · Enel Green |
62.0 MW | Withdrawn / abandoned |
| Enbridge Ingleside Storage Cancel Other · Enbridge Ingleside Solar, LLC |
61.9 MW | Withdrawn / abandoned |
| Enbridge Ingleside Solar Cancel Solar · Enbridge Ingleside Solar, LLC |
61.9 MW | Withdrawn / abandoned |
| Enbridge Ingleside Solar SLF Solar · Enbridge Ingleside Solar, LLC |
61.9 MW | Withdrawn / abandoned |
| OCI SunRoper MW Increase to 24INR0167 Solar · OCI SunRoper LLC |
61.6 MW | Withdrawn / abandoned |
| Langer Storage Battery storage · Langer Solar, LLC |
61.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)