United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Country Haven Energy Storage

Country Haven Energy Storage is a 72.1 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0035
Grid region
ERCOT (Texas)
Developer
174 Power Global Properties, LLC
Connection point (POI)
138 kV Lone Oak substation (Bus #6871)
Technology
Battery: 72.1 MW
Total requested
72.1 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
13 March 2023
Proposed online date
June 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem