ONSHORE WIND Β· ERCOT

Cameron Wind

Cameron Wind is a 80.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
03INR0015
Grid region
ERCOT (Texas)
Developer
Cielo Wind Power
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
6 September 2001
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem