Pioneer Hutt Solar (Add Additional MWs)

Pioneer Hutt Solar (Add Additional MWs) is a 65.8 MW solar request withdrawn in the ERCOT interconnection queue, in Midland County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0508
Grid region
ERCOT (Texas)
Developer
Pioneer Hutt Solar, LLC
Connection point (POI)
#23863 Driver Station 138kV
Location
Midland County, Texas
Technology
Solar: 65.8 MW
Total requested
65.8 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
August 2025
Withdrawn
October 2023

Location

Marker shows the centre of Midland County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Midland County