United States › Grid › Interconnection queues › Texas
SOLAR · ERCOTPioneer Hutt Solar (Alternative POI)
Pioneer Hutt Solar (Alternative POI) is a 116 MW solar request in interconnection study in the ERCOT interconnection queue, in Midland County, Texas.
Queue statusIn planning
- PlanningQueued Jun 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0121
- Grid region
- ERCOT (Texas)
- Developer
- NextEra Energy Interconnection Holdings LLC
- Connection point (POI)
- TAP 345kV 11028 Odessa Ehv - 59901 Grelton (West C)
- Location
- Midland County, Texas
- Technology
- Solar: 116 MW
- Total requested
- 116 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 28 June 2023
- Proposed online date
- July 2028
Location
Marker shows the centre of Midland County; the queue data does not give exact sites.
Other requests in Midland County
- Greater Bryant G SolarSolar · 17.7 MW · agreement signed
- TRIFECTA GasGas · 453 MW · in study
- Energy City BESSBattery storage · 205 MW · in study
- Drill Baby Drill BESSBattery storage · 204 MW · in study
- Jasper BESSBattery storage · 201 MW · in study
- Pioneer Hutt SolarSolar · 116 MW · suspended
- Pioneer DJ WindOnshore wind · 140 MW · built
- Gas project GEN-2009-007, Midland CountyGas · 550 MW · withdrawn
- Hutt WindOnshore wind · 336 MW · withdrawn
- Pioneer Hutt Solar (Add Additional MWs)Solar · 65.8 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem