United States › Grid › Interconnection queues › Texas
SOLAR · ERCOTGreater Bryant G Solar
Greater Bryant G Solar is a 17.7 MW solar request with a signed interconnection agreement in the ERCOT interconnection queue, in Midland County, Texas.
Queue statusConsented
- PlanningQueued Jun 2021 (completed)
- ConsentedJul 2022 (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 23INR0300
- Grid region
- ERCOT (Texas)
- Developer
- Greater Bryant G Solar, LLC
- Connection point (POI)
- 11165 Sloan Switch 138kV
- Location
- Midland County, Texas
- Technology
- Solar: 17.7 MW
- Total requested
- 17.7 MW
- Study phase
- SS Completed, FIS Completed, IA
- Queue status
- Active
- Entered queue
- 17 June 2021
- Agreement signed
- 18 July 2022
- Proposed online date
- September 2026
Location
Marker shows the centre of Midland County; the queue data does not give exact sites.
Other requests in Midland County
- TRIFECTA GasGas · 453 MW · in study
- Energy City BESSBattery storage · 205 MW · in study
- Drill Baby Drill BESSBattery storage · 204 MW · in study
- Jasper BESSBattery storage · 201 MW · in study
- Pioneer Hutt Solar (Alternative POI)Solar · 116 MW · in study
- Pioneer Hutt SolarSolar · 116 MW · suspended
- Pioneer DJ WindOnshore wind · 140 MW · built
- Gas project GEN-2009-007, Midland CountyGas · 550 MW · withdrawn
- Hutt WindOnshore wind · 336 MW · withdrawn
- Pioneer Hutt Solar (Add Additional MWs)Solar · 65.8 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem